Project Consultancy, Reports & Profiles

Best Business Opportunities in Kerala - Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship


What are the Benefits of Starting your own Business?

Being the boss gives a sense of pride and achievement that few others can match. When entrepreneurs start their own business, working at their own pace, choosing their own career path, and working in an environment of self-choice is possible. Entrepreneurs can develop critical entrepreneurial skills. Business management skills, along with those in the financial and technological sectors, are crucial to the operation of a company. They can also gain soft skills, such as teamwork and leadership when they’re just starting as an entrepreneur.  

With entrepreneurship, they liberate themself from the shackles of a steady paycheck. By starting their own business instead of working for a corporation that sets a profit limit for them, they will be able to explore and assert their value without being constrained by a profit limit. It will be up to them to set all the rules. The law or regulations of the company and their superiors don’t constrain them. They can deliver a product or service that reflects their vision. 

One of the main reasons to start a company is to be able to work on something you are passionate about. In the corporate world, it is never certain when a person is hired or fired. These career moves are beyond their control. Owning own business will allow investing in self-career and wellbeing for the long term.

 

The Advantages of Starting a Business in Kerala;

Kerala’s Business Friendly Policies; 

The Government of Kerala has taken many serious and proactive steps to improve the ease of doing business in Kerala. The Kerala Investment Promotion and Facilitation Act, 2018 is one of the initiatives undertaken as part of Ease of Doing Business. The amendments to the 7 Acts and 10 Rules have ensured a conducive environment for establishing and running businesses in the state.

The government has made efforts to eliminate redundant regulations, simplify clearance processes and reduce clearance timelines. Moreover, the Kerala government developed a web-based application called Kerala Single Window Interface for Fast and Transparent Clearance (KSWIFT). Through it, future transactions with the government regarding the issue of granting approvals and licenses can be made promptly. 

Transport in Kerala; 

The road and railway systems in Kerala are well-developed. National highways are connecting it with Tamil Nadu and Karnataka. The railway that travels from east to west through the Palghat Gap in the Western Ghats meets the railway that travels from north to south through the state to Kanyakumari. 

Kochi is the largest port, while intermediate ports can be found in Kozhikode, Alappuzha, and Neendakara, near Thiruvananthapuram. Each of these ports handles foreign and coastal traffic. Kochi also has major shipyards and oil refineries. More than 1,000 miles (1,600 km) of inland waterways serve as the main arteries for transporting bulk freight to and from ports. There are international airports at Thiruvananthapuram, Kozhikode, Kannur, and Kochi.

 

Minerals Resources in Kerala; 

The state of Kerala has several mineral deposits, including Heavy Mineral Sand (Ilmenite, Rutile, Zircon, Monazite, Sillimanite), Gold, Iron ore, Bauxite, Graphite, China Clay, and Fire Clay. Besides these, other minerals found in Kerala include Tile and Brick Clay, Lignite, Limestone, Limeshell, Dimension Stone (Granite), Gemstones, Magnesite, Steatite, and others.

 

Kerala’s Plantation and Vegetation;

In Kerala, the majority of the population depends directly or indirectly on agriculture for their livelihood. The state’s main crops are paddy, coconut, pepper, cashew, cassava, and rubber plantations. The agrarian economy dominates Kerala. Coconuts are the people’s main source of income from agriculture. The state of Kerala provides nearly 70% of all coconuts produced in India. 

In addition, cashews are an important cash crop of the state. In the state, raw cashew is processed into dried fruits, salted or plain. Cardamom is another cash crop that gives Kerala a distinct place in the Indian export market. The district of Alappuzha in Kerala is known as the ‘rice bowl of the state.’ 

 

The Ease of Doing Business in Kerala;  

Kerala has become the eighth state in the nation to successfully implement the “Ease of Doing Business” reform prescribed by the Ministry of Finance’s Department of Expenditure. Therefore, the state is eligible to borrow another Rs.2,261 crore through Open Market Borrowings. 

The Department of Expenditure granted permission for the project on 12th January 2021. As well as Andhra Pradesh, Karnataka, Madhya Pradesh, Odisha, Rajasthan, Tamil Nadu, and Telangana, Kerala completed the reforms. These eight states have been allowed to borrow an additional Rs.23,149 crore after they have completed reforms to facilitate ease of doing business. 

 

A Step-by-Step Guide to Starting a Business in Kerala; 

The following are the most important things you need to consider before starting a business in Kerala: 

Identify a local or global problem and provide a solution; 

Providing a product is best accomplished by finding a problem that we are experiencing and providing a solution to that particular problem. Businesses should be solution providers for their customers.

 

Prepare a Business Plan; 

Prior to starting a business, a plan is essential. You should plan how you are going to implement your idea and make it successful. Here are some questions to consider; 

     What is the purpose of your business?

     Who is your target audience?

     Geographical location

     The competitors

     The investment

     The team

     The revenue model 

 

Company Registration in Kerala; 

The registration of a company in Kerala requires the following; 

Shareholders

A minimum of two shareholders is required to register a private company in Kerala. 

 

Directors

At least two directors are needed for a private company. When a new company is formed from two or more existing companies or LLPs, the promoter company or LLP may nominate individuals as directors. For an individual to become a director, they must hold a valid DIN.

 

Digital Signature Certificate

A valid Digital Signature Certificate (DSC) is required for any filing in the MCA online application system.

 

Company Name

A private company’s name is composed of Name (Noun/Coined Word) + Activity Word + Private Limited.  You can check the availability of company names in Kerala and ensure that no similar or the same name already exists.

 

Share Capital

Share Capital in a Company refers to the amount that the owners of the company invest to operate the business. 

For registering a company, there is no minimum capital (authorized or paid-up capital) requirement. The registration fee payable to the Registrar of Companies depends on how much authorized capital each company has. 

 

Company Registration Process in Kerala; 

Company Name Application; 

There are two options for the applicant to proceed with the Company Name Application. 

Option 1. Approve the Company Name under the RUN Application process, and then proceed with applying for Company registration. 

Option 2. Complete the Integrated Company Registration Form. Company names can be reserved by filling out the SPICe company incorporation form. When applying for a name using the SPICe form, only one name can be submitted for approval. If the first applied name is rejected, an application can be resubmitted two more times with alternate names.

 

Incorporation of a company in Kerala with MCA: preparing and submitting the documentation; 

The SPICe process requires preparing and filing three e-forms to incorporate a company in Kerala. Documents executed/notarized/attested as per documentation requirements must be attached to the e-Form INC-32/33/34. The e-Form must be signed electronically with all shareholders and representatives’ Digital Signature Certificate (DSC). 

For all types of companies in Kerala, there is no registration fee if the authorized capital is less than or equal to a certain amount at the time of registration. However, filing fees for e-Form INC-33 / 34 and stamp duty apply to company registrations.

 

Processing of e-Forms by the Central Registrar of Companies’ office; 

After the Central Registration Center (CRC) verifies that all details and documentation are correct, the Central Registrar of Companies will register the company and issue;

 

Company Incorporation Certificate

For Directors - DIN

PAN (Permanent Account Number)

TAN to the New Company.

 

 

AD_20Art21


Reasons for buying our reports:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, market potential of the product and reasons for investing in the product

• This report provides vital information on the product like its characteristics and segmentation

• This report helps you market and place the product correctly by identifying the target customer group of the product 

• This report helps you understand the viability of the project by disclosing details like machinery required, project costs and snapshot of other project financials

• The report provides a glimpse of government regulations applicable on the industry

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decisions.

 

Our Approach:

• Our research reports broadly cover Indian markets, present analysis, outlook and forecast for a period of five years.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players

• We use reliable sources of information and databases. And information from such sources is processed by us and included in the report



We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Pickles (Various Types)
Pickles (Various Types)

Pickle is a general term used for fruits or vegetables preserved in vinegar or brine, usually with spices or sugar or both. Pickle producing busine... Read More

Capacity :
Plant and Machinery cost:
65.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
48.00 %
TCI :
527.00 Lakhs
Cost of Project :
527.00Lakhs
Add To Inquiry Basket
Condoms
Condoms

Control of fertility continues to be an important issue through the world even though the population growth rate has shown a steady decline in many... Read More

Capacity :
116,666.7 Pcs /Day
Plant and Machinery cost:
139.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
53.00 %
TCI :
400.00 Lakhs
Cost of Project :
400.00Lakhs
Add To Inquiry Basket
Sweet & Scented Supari in Pouches
Sweet & Scented Supari in Pouches

The betel nut (Supari) tree, which is known as "ARECA" in South India. It is planted in Bengal, Mysore, Sri Lanka etc. Its yield considered being v... Read More

Capacity :
Plant and Machinery cost:
9.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
192.00 Lakhs
Cost of Project :
192.00Lakhs
Add To Inquiry Basket
Cold Storage
Cold Storage

India is the largest producer of fru... Read More

Capacity :
3000 MT
Plant and Machinery cost:
266.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
43.00 %
TCI :
882.00 Lakhs
Cost of Project :
882.00Lakhs
Add To Inquiry Basket
ELECTROLYTIC MANGANESE DIOXIDE
ELECTROLYTIC MANGANESE DIOXIDE

EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active... Read More

Capacity :
Electrolytic Manganese Dioxide 5 MT Per Day
Plant and Machinery cost:
89.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
576.00Lakhs
Add To Inquiry Basket
Perfect Guide for Starting a Successful Business of Sulfur Powder Open Now Your Sulfur Powder Plant
Perfect Guide for Starting a Successful Business of Sulfur Powder Open Now Your Sulfur Powder Plant

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan for Production of Ready Mix Plaster,  Block Jointer, Tile Adhesive  and M 20 Concrete (Micro Concrete)
Business Plan for Production of Ready Mix Plaster, Block Jointer, Tile Adhesive and M 20 Concrete (Micro Concrete)

 

Ready Mix Plaster is a mixture of cement paste... Read More

Capacity :
0
Plant and Machinery cost:
294.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1342.00Lakhs
Add To Inquiry Basket
Start Phosphate Rich Organic Manure (PROM) Production Business
Start Phosphate Rich Organic Manure (PROM) Production Business

 

Phosphate rice or... Read More

Capacity :
Phosphate Rich Organic Manure (PROM) 28,800 MT Per Annum
Plant and Machinery cost:
182.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
78.00 %
TCI :
0.00 Lakhs
Cost of Project :
359.00Lakhs
Add To Inquiry Basket
Stainless Steel Cold Rolled Coil Using Stainless Steel Scrap Manufacturing Business
Stainless Steel Cold Rolled Coil Using Stainless Steel Scrap Manufacturing Business

Stainless steel cold rolled... Read More

Capacity :
0
Plant and Machinery cost:
2863.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
9293.00Lakhs
Add To Inquiry Basket
Setting up  Hemodialysis Blood Tubing  Business
Setting up Hemodialysis Blood Tubing Business

The introduction of hemodia... Read More

Capacity :
Homodialysis Blood Tubing Set 1,200,000 Pcs Per Annum
Plant and Machinery cost:
133.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
344.00Lakhs
Add To Inquiry Basket
Start Protein Based Nutrition Foods Production
Start Protein Based Nutrition Foods Production

 

Protein-based nut... Read More

Capacity :
Protein Based Nutrition Foods 1,200,000 Nos Per Annum (500 gms)
Plant and Machinery cost:
62.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
437.00Lakhs
Add To Inquiry Basket
A Business Plan for Soda Ash by Solvay process
A Business Plan for Soda Ash by Solvay process

 

Soda ash, also known as sodium carbonate, is a chemical compound produced when a base and an ac... Read More

Capacity :
Soda Ash (Na2CO3): 200,000 MT Per Annum, Ammonium Chloride (NH4Cl):200,000 MT Per Annum
Plant and Machinery cost:
14300.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
21000.00Lakhs
Add To Inquiry Basket
Floral Foam (Phenolic Foam) with Resin Manufacturing Business
Floral Foam (Phenolic Foam) with Resin Manufacturing Business

 

Floral foam, also known as phenolic foam, is a lightweight, highly porous foam material used to hold and hyd... Read More

Capacity :
Floral Foam (Phenolic Foam): 90,000 Kg. Per Annum
Plant and Machinery cost:
84.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
366.00Lakhs
Add To Inquiry Basket
Setup Glass Fiber Reinforced Polymer (GFRP) Rebar Plant
Setup Glass Fiber Reinforced Polymer (GFRP) Rebar Plant

Glass Fiber Reinforced Polymer (GFRP) Rebar is a type of composite material that is made from combining glass fibers with a polymer matrix. This co... Read More

Capacity :
Glass Fibre Reinforced Polymer (GFRP) Bar (Size 8mm to 36 mm): 360,000 MT Per Annum
Plant and Machinery cost:
588.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
6097.00Lakhs
Add To Inquiry Basket
Start Polyvinyl Alcohol Production business
Start Polyvinyl Alcohol Production business

Polyvinyl Alcohol (PVOH) is a synthetic polymer created through the polymerization of vinyl acetate. It is a water-soluble ... Read More

Capacity :
Polyvinyl Alcohol: 6,000 MT Per Annum
Plant and Machinery cost:
449.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
1193.00Lakhs
Add To Inquiry Basket
A Global Recycling Business, Setup Steel Ingot from Scrap to Reduce Landfill and Save the Environment
A Global Recycling Business, Setup Steel Ingot from Scrap to Reduce Landfill and Save the Environment

Paul Vaulting, an innovator... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Yeast  From Molasses
A Business Plan for Yeast From Molasses

Yeast from mol... Read More

Capacity :
Cream Yeast: 3,600 MT Per Annum Powder Yeast: 1,500 MT Per Annum
Plant and Machinery cost:
100.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
2900.00Lakhs
Add To Inquiry Basket
Start-up Production of Latex Mattress
Start-up Production of Latex Mattress

 

Late... Read More

Capacity :
Latex Mattress Size: 38" x 75" (33Kg): 9,091 Nos. Per Annum
Plant and Machinery cost:
77.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
75.00 %
TCI :
0.00 Lakhs
Cost of Project :
195.00Lakhs
Add To Inquiry Basket
A Business Plan For Zeolite 4a (Detergent Grade)
A Business Plan For Zeolite 4a (Detergent Grade)

Zeolite 4A is ... Read More

Capacity :
Zeolite 4a (Detergent Grade): 3,000 MT Per Annum
Plant and Machinery cost:
154.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
688.00Lakhs
Add To Inquiry Basket
A Business Plan for Lithium Ion Battery (Battery Assembly)
A Business Plan for Lithium Ion Battery (Battery Assembly)

A lithium ion ... Read More

Capacity :
-
Plant and Machinery cost:
86.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
516.00Lakhs
Add To Inquiry Basket
Start Production Of Glass Sheet
Start Production Of Glass Sheet

Glass sheet is a type of glass that has been pro... Read More

Capacity :
Glass Sheet: 1,500,000 Sq.mt. Per Annum
Plant and Machinery cost:
9000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
12900.00Lakhs
Add To Inquiry Basket
India Sugarcane Bagasse Biodegradable Disposable Tableware Market
India Sugarcane Bagasse Biodegradable Disposable Tableware Market

Sugarcane Bagasse Biodegradable Disposable Tableware is a typ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A business plan  For Cardanol From Cashew Nut Shell Oil
A business plan For Cardanol From Cashew Nut Shell Oil

 

Card... Read More

Capacity :
Cardanol 24 MT Per Day
Plant and Machinery cost:
152.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
658.00Lakhs
Add To Inquiry Basket
Setup plant of Truck Trailer (Sidewall, Flatbed, Bulker, Tip Trailer & Container Trailer)
Setup plant of Truck Trailer (Sidewall, Flatbed, Bulker, Tip Trailer & Container Trailer)

Truck trailers are an essential part of any frei... Read More

Capacity :
-
Plant and Machinery cost:
313.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
69.00 %
TCI :
0.00 Lakhs
Cost of Project :
484.00Lakhs
Add To Inquiry Basket
A Business Plan for Premix Tea and Coffee Cappuccino, Vanilla Flavoured Coffee, Mocha Coffee, Masala Chai, Ginger Tea & Green Tea (for Diabetic and Non Diabetic)
A Business Plan for Premix Tea and Coffee Cappuccino, Vanilla Flavoured Coffee, Mocha Coffee, Masala Chai, Ginger Tea & Green Tea (for Diabetic and Non Diabetic)

Premix Tea and... Read More

Capacity :
-
Plant and Machinery cost:
13.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
119.00Lakhs
Add To Inquiry Basket
Start production of Biodegradable Disposable  Cups and Plates (Tableware) Using Sugarcane Bagasse
Start production of Biodegradable Disposable Cups and Plates (Tableware) Using Sugarcane Bagasse

Bagasse is the fibrous residue that remains afte... Read More

Capacity :
-
Plant and Machinery cost:
1924.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
38.00 %
TCI :
0.00 Lakhs
Cost of Project :
2687.00Lakhs
Add To Inquiry Basket
Own Delicious and Nutritious Potato Chips and Extruded Snack Food (Kurkure Type) Production Plant
Own Delicious and Nutritious Potato Chips and Extruded Snack Food (Kurkure Type) Production Plant

 

Product:

<...
Read More
Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production of Ceramic Wall and Floor Tiles
Start Production of Ceramic Wall and Floor Tiles

Ceramic wall and floor tiles are a popular choice for a wide variety of applications, from residential to... Read More

Capacity :
Ceramic Wall & Floor Tiles 6,000 Sq.MT. Per Day
Plant and Machinery cost:
2724.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
5543.00Lakhs
Add To Inquiry Basket
A Business Plan  For Tantalum Powder from Tantalite Ore
A Business Plan For Tantalum Powder from Tantalite Ore

Tantalum is a rare transition metal that is mined from columbite-tantalite, which is an ore found in vari... Read More

Capacity :
Tantalum Powder 4 MT Per Day
Plant and Machinery cost:
235.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1935.00Lakhs
Add To Inquiry Basket
Setup Plant OF Mica Powder From Mica Deposits
Setup Plant OF Mica Powder From Mica Deposits

Mica powder is a fine, powdery mineral that is made from mica deposits. Mica is a type of natural rock th... Read More

Capacity :
Mica Powder 40 MT Per Day
Plant and Machinery cost:
296.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
2684.00Lakhs
Add To Inquiry Basket
Setup plant  Of Ferric Pyrophosphate (Food Grade and Pharma Gade)
Setup plant Of Ferric Pyrophosphate (Food Grade and Pharma Gade)

Ferric pyrophosphate is a phosphate-iron compound that is used as a food additive, dietary supplement and in p... Read More

Capacity :
Ferric Pyrophosphate Anhydrous 420 MT Per Annum (Food Grade) Ferric Pyrophosphate Nonhydrate 1
Plant and Machinery cost:
8.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
96.00Lakhs
Add To Inquiry Basket
Start Industry Of Chocolate
Start Industry Of Chocolate

Chocolate is a universally beloved food item made from cocoa ... Read More

Capacity :
Chocolate 1,000 Kg. Per Day
Plant and Machinery cost:
120.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
815.00Lakhs
Add To Inquiry Basket
Yeast from Molasses Dry & Compressed Yeast Manufacturing Plant
Yeast from Molasses Dry & Compressed Yeast Manufacturing Plant

Yeast from Molasses (Dry & Compressed Yeast) is a specialized type of yeast that ... Read More

Capacity :
Compressed Yeast 5,000 Kgs per day Dry Yeast 5,000 Kgs per day
Plant and Machinery cost:
2000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
2800.00Lakhs
Add To Inquiry Basket
Setup Industry  Of Connecting Rod MK2 (Electro Galvanized) for Hand Pump
Setup Industry Of Connecting Rod MK2 (Electro Galvanized) for Hand Pump

The connecting rod is an es... Read More

Capacity :
Connected Rod MK2 for Hand Pump 540,000 Pcs Per Annum MS Scrap 120 Pcs Per Annum
Plant and Machinery cost:
18.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
195.00Lakhs
Add To Inquiry Basket
Start Production Of Lawn Tennis Ball
Start Production Of Lawn Tennis Ball

The "lawn tennis ball," a specific ball, is the one used to p... Read More

Capacity :
Tennis Ball 10,000 Nos. per day
Plant and Machinery cost:
48.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
168.00Lakhs
Add To Inquiry Basket
Setup Plant Of Chlorinated Polyvinyl Chloride
Setup Plant Of Chlorinated Polyvinyl Chloride

Chlorinating the vinyl chloride monomer produces chlorinated polyvinyl chloride (CPVC... Read More

Capacity :
Chlorinated Polyvinyl Chloride 6,000 MT per Annum
Plant and Machinery cost:
396.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
1279.00Lakhs
Add To Inquiry Basket
Start Production Of PP Woven Bags
Start Production Of PP Woven Bags

Polypropylene woven bags, sometimes referred to as PP woven bags, are a kind of packa... Read More

Capacity :
PP Bags (L-915 x W-610 mm) (Per Bag Weight App. 90 gms) 100,000 Nos per day
Plant and Machinery cost:
1263.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
2314.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Biodegradable Plastic Bags From Corn Starch
Manufacturing Business Of Biodegradable Plastic Bags From Corn Starch

Environmentally friendly alternatives to conventional plastic... Read More

Capacity :
Biodegradable Plastic Bags (Per Bag 25 gms Size) 12 MT per day
Plant and Machinery cost:
1053.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
1498.00Lakhs
Add To Inquiry Basket
How to Setup Lawn Tennis Ball Plant
How to Setup Lawn Tennis Ball Plant

Tennis is a well-known sport, and the little, spherical, fuzzy yell... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan  Cosmetic Unit (Serum, Cream & Shampoo)
A Business Plan Cosmetic Unit (Serum, Cream & Shampoo)

A cosmetic unit typically includes a serum, cream, and shampoo that work together to hydrate, nourish, and protect your skin and hair. Serums are l... Read More

Capacity :
Serum 199,992 Nos Per Annum Cream 600,000 Nos Per Annum Shampoo 600,000 Nos Per Annum
Plant and Machinery cost:
32.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
552.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of Tin From Cassiterite
Start Manufacturing Business Of Tin From Cassiterite

Tin is an important metal that has played a crucial role in our society for centuries... Read More

Capacity :
Tin Ingot 6 MT Per Day
Plant and Machinery cost:
616.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
2279.00Lakhs
Add To Inquiry Basket
Setup Plant of Super Absorbent Polymer (SAP)
Setup Plant of Super Absorbent Polymer (SAP)

A superabsorbent polymer (SAP) is a type of polymer that has the ability to absorb an... Read More

Capacity :
Super Absorbent Polymer 8,000 MT Per Annum
Plant and Machinery cost:
1200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
2100.00Lakhs
Add To Inquiry Basket
Setup Business of Nano Resin Modified Bulk Composite for Dental Application
Setup Business of Nano Resin Modified Bulk Composite for Dental Application

 

Nano Resin Modifi... Read More

Capacity :
Nano Resin Modified Bulk Composite 2,000 Pcs Per Day
Plant and Machinery cost:
4.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
96.00Lakhs
Add To Inquiry Basket
Setting up Glass Fiber Reinforced Polymer (GFRP) Rebar Plant
Setting up Glass Fiber Reinforced Polymer (GFRP) Rebar Plant

 

Glass Fiber Reinforced Polymer (GFRP) rebar is an innovative construction material, engineered by embedding ... Read More

Capacity :
Glass Fibre Reinforced Polymer (GFRP) Bar (Size 8mm to 36 mm) 6 MT Per Day
Plant and Machinery cost:
211.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
549.00Lakhs
Add To Inquiry Basket
A Business Plan for Urea from Natural Gas
A Business Plan for Urea from Natural Gas

 

Capacity :
Urea Fertilizer 100 MT Per Day
Plant and Machinery cost:
1600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
3300.00Lakhs
Add To Inquiry Basket
Start Production of Ferrotitanium Using Induction Furnace
Start Production of Ferrotitanium Using Induction Furnace

Ferrotitanium using induction furnace is a specialized process that involves the melting a... Read More

Capacity :
Ferrotitanium 70 2,500,000 Kgs Per Annum Ferrotitanium 40 2,500,000 Kgs Per Annum
Plant and Machinery cost:
1200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
35.00 %
TCI :
0.00 Lakhs
Cost of Project :
1600.00Lakhs
Add To Inquiry Basket
Start Production of Biodegradable and Edible Tableware Products (for Animals) Using Rice Husk
Start Production of Biodegradable and Edible Tableware Products (for Animals) Using Rice Husk

Biodegradable and edible tableware products represent a remarkable fusion of innovati... Read More

Capacity :
Biodegradable and Edibile Tableware Products (Plate, Bowl & Cups) 72,000 Pcs Per Day
Plant and Machinery cost:
341.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
583.00Lakhs
Add To Inquiry Basket
Start Business of Sorbitol
Start Business of Sorbitol

Sorbitol is a type of sugar alcohol that is widely used as a sweetener in various foo... Read More

Capacity :
Sorbitol 6 MT Per Day
Plant and Machinery cost:
431.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
790.00Lakhs
Add To Inquiry Basket
A Business Plan For Sodium Silicate from Silica and Soda Ash
A Business Plan For Sodium Silicate from Silica and Soda Ash

Sodium silicate, commonly known as water glass, is a versatile compound with applications acros... Read More

Capacity :
5,000 MT Per Annum
Plant and Machinery cost:
334.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
808.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Blood Bags
Manufacturing Business Of Blood Bags

Blood bags are containers designed to store and transport blood and other related pro... Read More

Capacity :
Blood Bags 10,000 Nos per day
Plant and Machinery cost:
291.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
75.00 %
TCI :
0.00 Lakhs
Cost of Project :
1092.00Lakhs
Add To Inquiry Basket
A Business Plan For Nicotine From Tobacco Waste
A Business Plan For Nicotine From Tobacco Waste

Nicotine is a naturally occurring chemical compound that is f... Read More

Capacity :
Nicotine 100ml bottle each 3,500 Bottles per day
Plant and Machinery cost:
244.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
1662.00Lakhs
Add To Inquiry Basket
65 Good Profitable Ideas to Start Small-Scale Manufacturing Business in Nepal
65 Good Profitable Ideas to Start Small-Scale Manufacturing Business in Nepal

An exhaustive manual that o... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan Nonwoven Fabric For Mattress
A Business Plan Nonwoven Fabric For Mattress

 

Nonwoven fabric f... Read More

Capacity :
Nonwoven Fabric 400,000 Sq.mtrs. per day
Plant and Machinery cost:
797.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
2297.00Lakhs
Add To Inquiry Basket
Start Business Of Cashew Nut Processing With Value Added Products (Roasted Cashew, Fried Cashew, Flavored Cashew, Coated Cashew)
Start Business Of Cashew Nut Processing With Value Added Products (Roasted Cashew, Fried Cashew, Flavored Cashew, Coated Cashew)

 

A variety of meth... Read More

Capacity :
-
Plant and Machinery cost:
276.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
878.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of Semi Processed Canned Vegetable (Chickpeas & Red Kidney Beans)
Start Manufacturing Business Of Semi Processed Canned Vegetable (Chickpeas & Red Kidney Beans)

Semi Processed Canned Veget... Read More

Capacity :
Canned Chickpeas 1 Kg each 5,000 Th.Packs Per Annum Canned Red Kidney Beans 1 Kg each 5,000 Th.Pa
Plant and Machinery cost:
271.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
1398.00Lakhs
Add To Inquiry Basket
Business Plan For Silica From Rice Husk Ash
Business Plan For Silica From Rice Husk Ash

Silica is a mineral compound composed of silicon and... Read More

Capacity :
-
Plant and Machinery cost:
746.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
1327.00Lakhs
Add To Inquiry Basket
Start Production of Activated Carbon From Bamboo
Start Production of Activated Carbon From Bamboo

 

Activated carbon ... Read More

Capacity :
Activated Carbon 750 MT per Annum
Plant and Machinery cost:
196.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
546.00Lakhs
Add To Inquiry Basket
A Business Plan For Light Weight Bricks (EPS Bricks)
A Business Plan For Light Weight Bricks (EPS Bricks)

Light weight bricks, also k... Read More

Capacity :
EPS Light Weight Bricks 200 Cu.Mt. Per Day
Plant and Machinery cost:
25.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
31.00 %
TCI :
0.00 Lakhs
Cost of Project :
737.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Carton Boxes
Start Manufacturing Business Carton Boxes

Carton boxes, also known as corrugated boxes, are commonly us... Read More

Capacity :
Carton Boxes 20 MT Per Day
Plant and Machinery cost:
213.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
1023.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Start Rice Milling Plant - 28.00 824.00
Start Manufacturing of Wo... Wooden Pencils 69,444 Gross Per Day 28.00 2400.00
A Business Plan for Monoc... Monocrystalline Silicon Ingots 400 Kgs Per Day 28.00 555.00
A Business Plan for Fiber... Fiberglass Tape 24,000 Mtrs. Per Day 28.00 442.00
Setup Plant of Compressed... - 28.00 950.00
Ferrochrome Manufacturing... Ferrochrome 135 MT Per Day 10.00 40400.00
Start a Business Of LPG C... LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day 32.00 3475.00
Start Banana Wine Product... Banana Wine (750 ml size Bollte) 2,960 Bottles per day 25.00 1189.00
Activated Carbon From Ric... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Activated Carbon F... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Business of Flat G... 0 0.00 0.00
Set Up Business of Double... 0 0.00 0.00
A Business Plan for Bio-D... 10,000 MT Per Annum 28.00 8100.00
Sulphur Powder Manufactur... 20,000 MT Per Annum 24.00 4318.00
Manufacturing Business Gi... 60,000 Kg. Per Annum , 1,44,000 Kg. Per Annum 28.00 528.00
Start a Business of Manuf... 1,500 Dz. Per Annum 35.00 34.00
Start Activated Carbon fr... 0 0.00 0.00
Most Demandable Business ... 0 0.00 0.00
12345678910...

Showing 721 - 780 of 2956 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR